SOPs

Printlab Designer Department SOP

Version 0.4Last updated 13 Nov 2026

Videos (0) Ask a question about this SOP

Printlab Designer Department SOP

Language: English only
Status: Draft — not yet confirmed as a Printlab-official SOP
Draft date: 13 Nov 2026 (Asia/Kuala_Lumpur)
Applies to: Designer staff working on Printlab custom-print jobs on printlab.com.my

How to read this draft: when Designer may start, the return-to-CS rule, and the statuses Pending Payment / Complete Payment / Pending Artwork / Order Processing / Order Complete are taken from Vincent’s description of the Printlab custom-order flow (stated on 13 Nov 2026, Asia/Kuala_Lumpur) and from the 2025 CS workflow reminder. Later the same day he confirmed that a 14-day credit-term job (Wendy Wong, Andy Lau or David Ng only) may be printed before payment clears, that 4-Hour Printing is Express Same Day, that Order Complete means Ready for Collect or Ship Out, that Designer changes Pending Artwork to Order Processing after the client confirms the artwork, and that the processing cut-off is now 5PM only. Artwork-approval, file, and installation rules also come from the CS / Sales Drive files (David Ng). Anything still not stated is marked [TO CONFIRM].

Related drafts: order-workflow.md, cs-sales-sop.md, production-sop.md, packing-qc-sop.md, price-sop.md, cs-sales-terms.md, cs-sales-processing-days.md, cs-sales-installation-sticker-sop.md.


1. Purpose

  • Tell Designer when a job may be checked, what to check, and where the job goes next.
  • Stop artwork from being checked, and printing from starting, while the job is still unpaid.
  • Return jobs with a spec issue or a processing-day issue to CS, so CS can settle the matter with the customer before work continues.

2. Scope

In scope

  • Checking the artwork for a specific job after the job status on printlab.com.my is Complete Payment, or earlier for a 14-day credit-term job that may be printed before payment clears.
  • Assigning the job back to CS if there is a spec issue or a processing-day issue.
  • Releasing the job to Production when the artwork is OK and the customer has approved it.

Out of scope

  • Quotation, payment collection, Maybank checking, and the Complete Payment status update (CS / Sales and finance — see cs-sales-sop.md).
  • Printing and Finishing (production-sop.md).
  • Packing, QC, and shipping (packing-qc-sop.md).

Now stated in the Drive files (no longer treated as unknown)

  • Artwork is sent in the WhatsApp group, and approval is in the group. CS must not private-message Designer or Proofing. The customer must re-check the artwork and reply OK / Proceed to print.
  • Accepted file: PDF only, fonts outlined, pictures embedded. Colour on screen will not match print 100%. Finished size may differ by 1 mm–10 mm.
  • Processing days are on the August 2026 Version V5 chart (cs-sales-processing-days.md). If the file does not meet requirements, processing days pause and reset from the day the new artwork arrives.
  • For installation stickers, Designer must fill the artwork with the correct angle and the order number on the same day.

Still [TO CONFIRM]

  • Whether Designer creates or amends artwork, or only checks artwork supplied with the job (the files mention Design / Re-construct / Re-adjust services and design-fee limits, but not the Designer’s daily method).
  • The rest of the detailed check list (bleed, resolution, die-line, and so on) beyond the PDF / font / embed / colour / size rules above.
  • What exactly counts as a spec issue or a processing-day issue.
  • Designer working hours, turnaround, or capacity rules, other than the same-day installation-artwork rule.

3. Roles

RoleDuties stated
DesignerAfter Complete Payment, check the artwork for that specific job. Exception: a 14-day credit-term job handled by Wendy Wong, Andy Lau or David Ng may be checked and printed before payment clears. If there is a spec issue or a processing-day issue, assign the job back to CS. If the artwork is OK and the customer has approved it, the job goes to Production. The general CS SOP rule is that Designer only checks paid orders (rule 42.0); the credit-term exception comes from Vincent on 13 Nov 2026. Read CS comments, and the compulsory template in the comment system, so the latest changes are visible without asking repeatedly. Work with CS only through the group, not private message. Both Proofing / Designer numbers (KL and KT) must be in the customer WhatsApp group: 60 11-1066 9928 and 60 11-1094 5678.
CS / CSASettle spec or processing-day issues with the customer when Designer assigns the job back. Log every workflow change in the order-status comments. Post artwork and the order template in the WhatsApp group; do not private-message Designer or Proofing.
CS team leader (Lysha, Izzat or Faiz) or Finance Admin (Ms Norhan)Set the job to Complete Payment after Maybank clearance. This is the usual gate before Designer may check artwork, except for a 14-day credit-term job.
Production (Printing)Receives the job only after artwork is OK and the customer has approved it.
ManagementIntended readers of order-status comments, with the designer team. (CS reminder)

4. Step-by-step procedure

4.1 Do not start an ordinary job while it is Pending Payment

  1. Unpaid ordinary jobs show status Pending Payment on printlab.com.my.
  2. For those jobs, Designer cannot check the artwork yet, and the job cannot be printed.
  3. Exception: if the job is a 14-day credit-term order handled by Wendy Wong, Andy Lau or David Ng, Designer may check the artwork and the job may be printed before payment clears. If an ordinary (non-credit) job reaches Designer still showing Pending Payment, do not check it; escalate to CS. [TO CONFIRM] whether Designer should also return that ordinary job on printlab.com.my, or only wait.

4.2 Start work after Complete Payment, or earlier on a credit-term job

  1. An ordinary job may flow to Designer only after the CS team leader (Lysha, Izzat or Faiz) or Finance Admin (Ms Norhan) has updated that job to Complete Payment. A 14-day credit-term job may arrive earlier.
  2. Before checking, read the order-status comments on printlab.com.my (design changes, quantity, size or material changes, payment holds, and other customer requests logged by CS).
  3. Check the artwork for that specific job. Also read the compulsory template that CS must paste into the comment system (Customer_Service_SOP 3.4.xlsx, rule 56.0).
  4. File requirements from Printlab SOP.jpeg (clauses 7, 9, 10 and 13): accept PDF only; fonts and wordings must be outlined; pictures must be embedded; tell CS if the file does not meet requirements, because processing days will be paused and reset; finished size may differ by 1 mm–10 mm; colour will not match the screen 100%.
  5. [TO CONFIRM] any further points Designer must check (bleed, resolution, die-line, and so on), and whether any of that check is done in a tool other than printlab.com.my and the WhatsApp group.

4.3 If there is a spec issue or a processing-day issue

  1. Assign the job back to CS.
  2. CS settles the issue with the customer before the job returns to Designer.
  3. Use the August 2026 processing-days chart (cs-sales-processing-days.md) when judging a processing-day issue. Cut-off is 5PM, with artwork approved (the chart image still shows 4PM; that time was superseded on 13 Nov 2026). Saturday, Sunday and public holidays are not working days. An order cannot be changed to Urgent after it is placed.
  4. [TO CONFIRM] how the assignment back is made on printlab.com.my; what note Designer must leave; and the exact definitions of “spec issue” and “processing-day issue”.
  5. Do not send the job to Production until the issue is settled, the artwork is OK, and the customer has approved it.

4.4 If the artwork is OK and the customer has approved it

  1. Artwork is sent in the WhatsApp group, and artwork approval is in the group (Customer_Service_SOP 3.4.xlsx, rule 56.0). The customer must re-check all details and reply OK / Proceed to print (Printlab SOP.jpeg, clause 11). Until that confirmation, the job status is Pending Artwork.
  2. After the client confirms the artwork, Designer changes the job status from Pending Artwork to Order Processing. That is the portal record that the artwork is confirmed and the job may go to Production. (Vincent, 13 Nov 2026)
  3. After proofing, CS posts an update in the group with the order number. If the job is already printing, CS must tell the customer it cannot change (rule 18.0).
  4. Express Same Day (also called 4-Hour Printing) starts only after payment and the design is confirmed (rule 2.0), except that a 14-day credit-term job may be printed before payment clears, once the design is confirmed.
  5. The job then goes to the Production department, starting with Printing.

4.5 Installation sticker artwork

For installation-sticker jobs, follow cs-sales-installation-sticker-sop.md. Designer must fill up the artwork with the correct angle and the order number, and must do this on the same day (Installation Sticker SOP 1.1.xlsx).


5. Status changes

Status on printlab.com.myMeaning for DesignerWho updates it (as stated)
Pending PaymentDo not check artwork on an ordinary job. A 14-day credit-term job may be checked before payment clears.[TO CONFIRM] who first sets this status (not Designer)
Complete PaymentThe usual gate before Designer may check the artwork. The job then shows Pending Artwork. On a credit-term job this payment update can happen later.CS team leader (Lysha, Izzat or Faiz) or Finance Admin (Ms Norhan)
Pending ArtworkDesigner is checking the artwork and waiting for the client to confirm it.After Complete Payment, before Order Processing
Order ProcessingDesigner changes the status from Pending Artwork to Order Processing after the client confirms the artwork. The job may then go to Production.Designer
Order CompleteReady for Collect or Ship Out. Not a Designer update. The portal’s “Order Completed / Ready to Collect” is the same status.Packing & QC

[TO CONFIRM] any further Designer or “returned to CS” status names beyond Pending Artwork and Order Processing.


6. Hand-off rules

FromToHand-off rule as stated
CS / SalesDesignerAfter Complete Payment, or earlier for a 14-day credit-term job that may be printed before payment clears.
DesignerCSAssign the job back if there is a spec issue or a processing-day issue. CS settles it with the customer.
DesignerProduction (Printing)Only when the artwork is OK and the customer has confirmed it. Designer then changes the status from Pending Artwork to Order Processing.
Production or Packing & QCDesigner[TO CONFIRM] whether jobs can be sent back to Designer after printing has started, and in what cases.

7. Checklist

  • Job status on printlab.com.my is Complete Payment or Pending Artwork, not Pending Payment, unless this is a 14-day credit-term job that may proceed before payment clears
  • Order-status comments have been read (design, quantity, size, material, holds, and other CS notes)
  • Artwork for this specific job has been checked
  • If there is a spec issue or a processing-day issue: job assigned back to CS; not sent to Production
  • File is PDF, fonts outlined, pictures embedded, or the job is returned to CS because the file does not meet requirements
  • If the artwork is OK and the customer has replied OK / Proceed to print in the group: Designer has changed the status from Pending Artwork to Order Processing, and the job is released to Production (Printing)
  • Customer approval is in the WhatsApp group, and is recorded on the portal by the Designer status change to Order Processing
  • Installation-sticker artwork, if any, has the correct angle and the order number, done the same day

8. Escalation

SituationWho handles it, as stated
Job is still Pending PaymentDo not check artwork unless it is a 14-day credit-term job handled by Wendy Wong, Andy Lau or David Ng. Payment and status sit with CS / the team leader (Lysha, Izzat or Faiz) / Finance Admin (Ms Norhan).
Spec issue or processing-day issueAssign the job back to CS to settle with the customer.
Disagreement on spec, date, or approval[TO CONFIRM] — CS is the customer contact; further escalation path not stated
Artwork missing, unreadable, or in the wrong job record[TO CONFIRM]

9. Terms & Conditions

The official customer-facing text is the photo in cs-sales-terms.md (Printlab SOP.jpeg, starting 1 Nov 2018). Points that now apply to Designer:

  1. Customer approval is the reply OK / Proceed to print after the customer has re-checked the artwork (clause 11). Printlab is not responsible for replacements if the customer then receives the wrong printed products.
  2. Design / re-construct / re-adjust fees: design fee covers a maximum of 2 re-edits; re-adjust fee covers a maximum of 1; a 3rd or later change is an extra fee. Artwork soft copy can be added with an extra charge (clauses 2–6).
  3. After proofing, if the job is already printing, CS must tell the customer it cannot change (Customer_Service_SOP 3.4.xlsx, rule 18.0).
  4. Processing days: use cs-sales-processing-days.md. If files do not meet requirements, days pause and reset from the day the new artwork is received (clause 12).
  5. Colour will look different on screen and on different printers and materials. Printlab cannot match the screen 100% (clauses 7 and 9). Finished size may differ by 1 mm–10 mm (clause 13).
  6. PDF only, fonts outlined, pictures embedded (clause 10).

Designer records the client’s confirmation on printlab.com.my by changing Pending Artwork to Order Processing. Still [TO CONFIRM]: who is responsible if artwork is printed with a spec error that Designer did not catch, and whether the WhatsApp “OK / Proceed to print” wording must also be pasted into the order comments.

Videos

No videos yet