SOPs

Printlab Packing & QC Department SOP

Version 0.4Last updated 13 Nov 2026

Videos (0) Ask a question about this SOP

Printlab Packing & QC Department SOP

Language: English only
Status: Draft — not yet confirmed as a Printlab-official SOP
Draft date: 13 Nov 2026 (Asia/Kuala_Lumpur)
Applies to: Packing and Quality Control staff on Printlab custom-print jobs. Packing and QC are currently one combined department and are not yet separated.

How to read this draft: the hand-off from Finishing and the Order Complete status are taken from Vincent’s description of the Printlab custom-order flow (stated on 13 Nov 2026, Asia/Kuala_Lumpur). Later the same day he confirmed that Order Complete means Ready for Collect or Ship Out, and that the portal poster’s “Order Completed / Ready to Collect” is the same status. Courier versus self-collect, the order-number rule, and portal collection steps come from the CS / Sales Drive files (David Ng). Anything still not stated is marked [TO CONFIRM].

Related drafts: order-workflow.md, cs-sales-sop.md, designer-sop.md, production-sop.md, price-sop.md, cs-sales-processing-days.md, cs-sales-check-order-status.md, cs-sales-terms.md.


1. Purpose

  • Receive a finished job from the Finishing operator, check and pack it, and ship it to the customer.
  • Set the specific job’s status on printlab.com.my to Order Complete when that has been done.
  • Keep Packing and QC as one combined department until a later decision splits them.

2. Scope

In scope

  • Receiving the job when the Finishing operator assigns it to Packing & QC.
  • Quality control and packing, as one combined department.
  • Shipping the job to the customer.
  • Changing the job status to Order Complete.

Out of scope

  • Quotation and payment (cs-sales-sop.md).
  • Artwork check (designer-sop.md).
  • Printing and Finishing work (production-sop.md).
  • A separate Packing department or a separate QC department — these are not yet split.

Not stated — all [TO CONFIRM]

  • QC pass / fail criteria, sampling, and what to do with a rejected job.
  • Packing materials, labelling, and packing standards.
  • Who books the appointed courier, and how tracking is recorded.

Fulfilment method is no longer unknown: appointed courier or self-collect only (see 4.3).


3. Roles

RoleDuties stated
Packing & QC (combined department)Receive the job from the Finishing operator. Ship by the appointed courier, or release at self-collect against the order number. Change the specific job’s status to Order Complete (Ready for Collect or Ship Out).
Finishing operatorAssigns the job to Packing & QC when finishing is done.
CS / SalesCustomer contact before and during the job. Confirms courier or self-collect (KL / Kuala Terengganu / Ara). Tells the customer to bring the order number and to check My Account > Orders before collecting. [TO CONFIRM] whether CS or Packing & QC tells the customer that the job has been shipped or is ready to collect.
Designer / PrintingNot part of packing or QC, unless a rejected job is sent back — [TO CONFIRM].

[TO CONFIRM] named team leader for the combined Packing & QC department, and how work is split between packing and checking while the department is still combined.


4. Step-by-step procedure

4.1 Receive the job

  1. The Finishing operator, when finishing is done, assigns the job to Packing & QC.
  2. Packing & QC take the physical job and the job record on printlab.com.my.
  3. [TO CONFIRM] the receiving check (quantity, product, finishing, job number) before packing starts.

4.2 Quality control and packing

  1. Packing and QC are done in the same department (not yet separated).
  2. [TO CONFIRM] the QC steps, the packing steps, the order of those steps, and what happens if the job fails QC (return to Finishing or Printing, return to Designer, or CS contact with the customer).
  3. Do not invent a reject or reprint rule until it is confirmed.

4.3 Ship or release to the customer and complete the order

  1. Fulfilment is appointed courier or self-collect only (KL / Kuala Terengganu / Ara). No Lalamove or Grab. (Customer_Service_SOP 3.4.xlsx, rules 27.0 and 28.0)
  2. Free delivery for orders over RM200: 1 parcel, 1 time. (rule 24.0)
  3. Self-collect needs the order number. No number = no release. (rule 29.0; CHECK ORDER STATUS .pdf)
  4. Check the portal status before the customer collects. How the customer checks status is in cs-sales-check-order-status.md. Early pickup: David or Alya only. (rule 30.0)
  5. Pickup windows on the August 2026 chart (cs-sales-processing-days.md): same-day collect 8PM–10PM; urgent and normal collect 5PM–10PM. Closed Saturday, Sunday and public holidays.
  6. Arrival notes on that chart: press the doorbell at the front gate, or call 011-10533123 (Bandar Sri Damansara, available until 10pm) or 011-10766787 (Ara Damansara, available until 5.30pm).
  7. Packing & QC then change the status of that specific job to Order Complete, which means Ready for Collect or Ship Out. The portal poster’s “Order Completed / Ready to Collect” is the same status.
  8. [TO CONFIRM] whether that status is set only after the courier has collected the parcel, after a tracking number is entered, or after the customer has collected; and what comment, if any, must be written on the job.
  9. CS should already have told the customer to report damage within 3 days of delivery. (rule 22.0)
  10. For a new customer, CS confirms receipt and then asks for a 5-star review. (rule 26.0)

5. Status changes

Status on printlab.com.myMeaning for Packing & QCWho updates it (as stated)
Pending PaymentThe job should not have been printed or packed. If it appears here, stop and raise it with CS.Not Packing & QC
Complete PaymentEarlier payment gate. Packing & QC receive the job later, after Designer and Production. A 14-day credit-term job may have been printed before this status was set.CS team leader (Lysha, Izzat or Faiz) or Finance Admin (Ms Norhan)
Pending ArtworkStill with Designer, before the client confirms the artwork. Packing & QC should not yet have this job.After Complete Payment, before Order Processing
Order ProcessingDesigner has already changed the status from Pending Artwork to Order Processing after the client confirmed the artwork. The job then goes through Production before it reaches Packing & QC.Designer (not Packing & QC)
Order CompleteReady for Collect or Ship Out. The portal poster’s “Order Completed / Ready to Collect” is the same status.Packing & QC

[TO CONFIRM] any “In Packing” or “In QC” status names after Order Processing.


6. Hand-off rules

FromToHand-off rule as stated
Finishing operatorPacking & QCWhen finishing is done, the Finishing operator assigns the job to Packing & QC.
Packing & QCCustomerPacking & QC ship by the appointed courier, or release at self-collect against the order number, then set Order Complete.
Packing & QCFinishing, Printing, Designer, or CS[TO CONFIRM] the return path if QC fails or the shipment cannot go out.

7. Checklist

  • Job received from the Finishing operator
  • Job matches the order — [TO CONFIRM] the fields to check
  • QC completed under the combined department — [TO CONFIRM] pass criteria
  • Job packed — [TO CONFIRM] packing standard
  • Fulfilment is appointed courier or self-collect, not Lalamove or Grab
  • Self-collect: order number checked; portal status checked; early pickup only if David or Alya approved it
  • Job shipped or released — [TO CONFIRM] courier booking and tracking
  • Specific job status on printlab.com.my changed to Order Complete (Ready for Collect or Ship Out)

8. Escalation

SituationWho handles it, as stated
Job arrives with finishing or print faults[TO CONFIRM] — return path not stated; do not ship a job that is known to be wrong once a reject rule is confirmed
Address, courier, or collection problemCS is the customer contact. Address changes are only allowed before the order is created (rule 37.0). Appointed courier or self-collect only.
Customer claims a short, damaged, or wrong shipment after Order CompleteTell the customer the 3-day damage-report window (rule 22.0). Further reprint or reject rules are [TO CONFIRM]. The customer T&C says Printlab is not responsible for replacements if the customer approved artwork and then received the wrong printed products (cs-sales-terms.md, clause 11).
Pressure to set Order Complete before the job is shipped or released at self-collectDo not. Set Order Complete when the job is ready for collect or has been shipped out.

9. Terms & Conditions

The official customer-facing text is in cs-sales-terms.md. Points that now apply to Packing & QC:

  1. Fulfilment: appointed courier or self-collect only (KL / Kuala Terengganu / Ara). No Lalamove or Grab. Free delivery over RM200, one parcel, one time.
  2. Self-collect requires the order number. Customers must check My Account > Orders and follow the collect day. Pickup windows and the Bandar Sri Damansara / Ara Damansara phone numbers are in cs-sales-processing-days.md.
  3. Early delivery or pick-up is an add-on charge (Printlab SOP.jpeg, clause 8) and needs David or Alya approval (rule 30.0).
  4. Damage to be reported within 3 days of delivery (rule 22.0).
  5. Finished size may differ by 1 mm–10 mm. Colour will not match the screen 100%.
  6. [TO CONFIRM] QC pass / fail standard; reprint or reject rules; risk if a parcel is delayed, lost, or damaged in transit; and whether Order Complete has any effect on payment, credit terms, or the right to claim.

Videos

No videos yet