SOPs
Printlab Production Department SOP
Videos (0) Ask a question about this SOP
Printlab Production Department SOP
Language: English only
Status: Draft — not yet confirmed as a Printlab-official SOP
Draft date: 13 Nov 2026 (Asia/Kuala_Lumpur)
Applies to: Production staff on Printlab custom-print jobs. Production has two sub-departments: Printing and Finishing.
How to read this draft: the Printing-then-Finishing path and the unpaid-job rule are taken from Vincent’s description of the Printlab custom-order flow (stated on 13 Nov 2026, Asia/Kuala_Lumpur). Processing days, cut-off, surfaces, size tolerance, and related CS rules come from Processing Day Aug-2026-Version V5.png, Printlab SOP.jpeg, and Customer_Service_SOP 3.4.xlsx (CS / Sales Drive folder, files by David Ng). Anything still not stated is marked [TO CONFIRM].
Related drafts: order-workflow.md, cs-sales-sop.md, designer-sop.md, packing-qc-sop.md, price-sop.md, cs-sales-processing-days.md, cs-sales-terms.md.
1. Purpose
- Set out how a custom-print job moves through Production after artwork is OK and the customer has approved it.
- Keep Printing and Finishing as two sub-departments, in that order.
- Make sure unpaid jobs are not printed, and that finished work is assigned to Packing & QC.
2. Scope
In scope
- Printing: print the job after it arrives from Designer.
- Finishing: receive the printed job from Printing, complete finishing, then assign it to Packing & QC.
Out of scope
- Quotation, payment, and Complete Payment (
cs-sales-sop.md). - Artwork check, return to CS, and customer approval of artwork (
designer-sop.md). - Packing, quality control, shipping, and the Order Complete status (
packing-qc-sop.md). Packing & QC is a later department (currently combined, not yet separated). It is not part of Production.
Not stated — all [TO CONFIRM]
- Machines, materials, print methods, colour standards, and make-ready steps.
- Types of finishing (for example lamination, binding, cutting, mounting) and when each applies.
- In-production quality checks, waste, reprints, and what to do if a job is damaged or short.
- Shift patterns and machine-level job priority inside Production, beyond the published processing-days chart and the Saturday-express / 4-Hour Printing notes below.
3. Roles
| Role | Duties stated |
|---|---|
| Printing (Production sub-department) | Starts printing only after the job has come from Designer with artwork OK and customer approval. Must not print an ordinary job while it is Pending Payment. A 14-day credit-term job handled by Wendy Wong, Andy Lau or David Ng may be printed before payment clears. After printing is done, assign the job to Finishing. |
| Finishing operator (Production sub-department) | Completes finishing, then assigns the job to Packing & QC. |
| Designer | Sends the job into Production only when the artwork is OK and the customer has approved it. |
| CS / CSA | Do not start production from the CS side. If Designer has returned a job for a spec or processing-day issue, CS must settle it with the customer first. |
| Packing & QC | Receives the job from the Finishing operator; not a Production role. |
[TO CONFIRM] named supervisors for Printing and for Finishing, and how operators are assigned to a job.
4. Step-by-step procedure
4.1 Gate before any printing
- An ordinary job that is Pending Payment on printlab.com.my cannot be printed.
- Exception: a 14-day credit-term job handled by Wendy Wong, Andy Lau or David Ng may be printed before payment clears.
- Production should only receive the job after Designer has checked the artwork, the artwork is OK, the customer has confirmed it, and Designer has changed the status from Pending Artwork to Order Processing. For an ordinary job, payment must also already be Complete Payment.
- If an ordinary job arrives still unpaid, or any job arrives without artwork approval, do not print it. [TO CONFIRM] the exact check Printing must make on printlab.com.my before starting, and who to notify.
4.2 Printing
- The job enters the Production department and starts in Printing.
- Printing prints the job.
- When printing is done, Printing assigns the job to Finishing.
- Do not start printing an ordinary job while it is unpaid, or before payment and the design are confirmed. Express Same Day (also called 4-Hour Printing) starts only after both (Customer_Service_SOP 3.4.xlsx, rule 2.0). A 14-day credit-term job may be printed before payment clears, once the design is confirmed.
- Follow the published processing days and the 5PM cut-off in
cs-sales-processing-days.md. (The August 2026 chart image still shows 4PM; that cut-off was superseded on 13 Nov 2026.) Saturday, Sunday and public holidays are not working days. An order cannot be changed to Urgent after it is placed. For Saturday express, CS will have tagged Prema (rule 39.0). - Surfaces CS should already have told the customer (rule 38.0): Digital / Eco Solvent = semi gloss (can laminate); UV types = matte (cannot). Large format: bigger than A3 = Roll; A3 = Sheet (rule 41.0). CS should also have checked that “Assign Job to Printer” is correct (rule 25.0).
- Finished size may differ by 1 mm–10 mm because of finishing and material (Printlab SOP.jpeg, clause 13). Printed colour will differ from the screen and from other printer or material types (clauses 7 and 9).
- [TO CONFIRM] print steps, sign-off, quantity check, and how the assignment to Finishing is made on printlab.com.my.
4.3 Finishing
- The Finishing operator receives the job from Printing.
- The Finishing operator completes the finishing work.
- When finishing is done, the Finishing operator assigns the job to Packing & QC.
- [TO CONFIRM] finishing steps for each product type, and how the assignment to Packing & QC is made on printlab.com.my.
4.4 What Production does not do
- Production does not set Order Complete. That status (Ready for Collect or Ship Out) is set by Packing & QC.
- Production does not collect payment or check Maybank.
- Production does not settle spec or processing-day issues with the customer; those go back through Designer to CS.
5. Status changes
| Status on printlab.com.my | Meaning for Production | Who updates it (as stated) |
|---|---|---|
| Pending Payment | Do not print an ordinary job. A 14-day credit-term job may be printed before payment clears. | Not Production |
| Complete Payment | Payment gate has been passed, but Production still waits until Designer has the client’s confirmation. On a credit-term job this may already be in print. | CS team leader (Lysha, Izzat or Faiz) or Finance Admin (Ms Norhan) |
| Pending Artwork | Still with Designer. Do not print until the client has confirmed the artwork and the status has moved on. | After Complete Payment, before Order Processing |
| Order Processing | Designer has changed the status from Pending Artwork to Order Processing after the client confirmed the artwork. Production may then print (subject to the payment rule above). | Designer |
| Order Complete | Ready for Collect or Ship Out. Not a Production update. The portal’s “Order Completed / Ready to Collect” is the same status. | Packing & QC |
[TO CONFIRM] any “In Printing”, “In Finishing”, or similar status names after Order Processing. Until confirmed, follow the hand-off (assign to Finishing, then assign to Packing & QC) as described, without inventing status labels.
6. Hand-off rules
| From | To | Hand-off rule as stated |
|---|---|---|
| Designer | Printing | Only when the artwork is OK, the customer has confirmed it, and Designer has changed the status from Pending Artwork to Order Processing. Never print an ordinary Pending Payment job. A 14-day credit-term job may be printed before payment clears. |
| Printing | Finishing | After printing is done, assign the job to Finishing. |
| Finishing operator | Packing & QC | After finishing is done, assign the job to Packing & QC (one combined department, not yet separated). |
| Production | Designer or CS | [TO CONFIRM] whether Production may assign a job back if a print or finishing problem needs a new customer decision. |
7. Checklist
Printing
- Job is not Pending Payment, unless it is a 14-day credit-term job that may be printed before payment clears
- Job has come from Designer with artwork OK and customer approval
- Job printed as specified — [TO CONFIRM] the production ticket / spec fields to check
- Job assigned to Finishing
Finishing
- Job received from Printing
- Finishing completed as specified — [TO CONFIRM] the finishing list for this product
- Job assigned to Packing & QC by the Finishing operator
- Status Order Complete has not been set by Production
8. Escalation
| Situation | Who handles it, as stated |
|---|---|
| Job is Pending Payment, or payment is unclear | Do not print unless it is a 14-day credit-term job handled by Wendy Wong, Andy Lau or David Ng. Payment sits with CS / the team leader (Lysha, Izzat or Faiz) / Finance Admin (Ms Norhan). |
| Artwork not approved, or a spec / processing-day issue is still open | The job should not be in Production. It belongs with Designer and CS. |
| Print or finishing fault, shortage, or damaged work | [TO CONFIRM] supervisor path, and whether a reprint needs CS or Designer |
| Customer asks for a change after printing has started | CS is the customer contact. If the job is already printing, CS must tell the customer it cannot change (Customer_Service_SOP 3.4.xlsx, rule 18.0). |
9. Terms & Conditions
The official customer-facing text is in cs-sales-terms.md (Printlab SOP.jpeg). Points that now apply to Production:
- Processing days and pickup windows:
cs-sales-processing-days.md(August 2026 Version V5). If artwork is late or rejected, days pause and reset from the day the new artwork is received. - Colour will not match the screen 100%, and will differ by printer and material. Finished size may differ by 1 mm–10 mm.
- Once a job is already printing, the customer is told it cannot change (CS rule 18.0).
- Production must not start an ordinary job while it is Pending Payment. A 14-day credit-term job handled by Wendy Wong, Andy Lau or David Ng may be printed before payment clears.
- [TO CONFIRM] who bears the cost of a reprint caused by a production error, a Designer error, or a customer artwork error, and any quantity tolerance beyond the 1 mm–10 mm size rule.
Progress is saved on this device for version 0.5.
4.1 Gate before any printing
4.2 Printing
4.3 Finishing
7. Checklist
9. Terms & Conditions
Videos
No videos yet